翻訳と辞書
Words near each other
・ Requirements management
・ Requirements Modeling Framework
・ Requirements Office
・ Requirements specification
・ Requirements traceability
・ Requisite organization
・ Requisition
・ Requital
・ Requínoa
・ Reqwireless
・ RER
・ RER A
・ RER B
・ Rer Bare people
・ RER C
RER D
・ RER E
・ Rera
・ Reradiation
・ Rerau language
・ RERE
・ Rere
・ ReRe Hello
・ Rere, Chile
・ Rere-o-maki
・ Rerebrace
・ Reredorter
・ Reredos
・ Reredos of Our Lady of Light
・ Reremoana Hakiwai


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

RER D : ウィキペディア英語版
RER D

The RER D is one of the five lines in the RER rapid transit system serving Paris, France.
The line officially runs from the northern terminus Orry-la-Ville – Coye (D1) to the southern terminuses Melun (D2) and Malesherbes (D4). In reality, some trains continue north to Creil except during rush hours, and the link between Juvisy-sur-Orge and Melun via Corbeil-Essonnes is operated by RER D.
Due to its high rate of incidents and social disturbances, RER D line is colloquially known as "RER poubelle" (Trash).〔From French version: "Des incident fréquents: un RER 'poubelle'?" ("Frequent incidents: 'RER Trash'?").
* First inauguration : 27 September 1987
* Length :
* Number of stops : 59 (including Corbeil-Essonnes Melun branch, Chantilly and Creil)
Line D links the ''Gare du Nord'' with the ''Gare de Lyon'' via ''Châtelet – Les-Halles''. The section north of the ''Gare du Nord'' opened in the late 1980s; a dedicated tunnel opened in 1995 to connect it to the SNCF network south of the ''Gare de Lyon'', part of which was transferred to the RER.
==Chronology==

* 27 September 1987: Inauguration of Line D. Operated Villiers-le-Bel – Gare du Nord – Châtelet-Les Halles, 19 km, using the Line B Tunnel to Châtelet – Les Halles
* 1988: Extension north towards Goussainville.
* September 1990: Extension north towards Orry-la-Ville.
* September 1995: Inauguration of "Interconnexion Sud-Est". The line is extended from Châtelet to Melun and La Ferté-Alais then Malesherbes (the following year, 1996) in the south of Paris.
* 25 January 1998: New station, St-Denis – Stade de France, opened. Located between Gare du Nord and St-Denis.
* 29 January 2007: First renovated Z 20500 stock in service.
* 19 March 2008: Start of the "D Maintenant" programme by Guillaume Pepy, the president of SNCF.
* 14 December 2008: Reduced "Interconnexion Nord-Sud" service, with 8 interconnected trains per hour.
* Late 2009: End of the "D Maintenant" programme.
* 7 December 2011: Start of studies for the doubling of the Châtelet-Gare du Nord tunnel.
* 15 December 2013: New station, Créteil-Pompadour, opened.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「RER D」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.